More Info

Client: SPIE

Project: Jacksons Bakery new build factory

Project Summary:

Sector // Food

Jacksons Bakery new build factory // SPIE

Installation of the mechanical services for a new purpose built manufacturing facility.

Defabs team liaised closely with the client's project manager to agree a phased installation of services to production equipment as the project progressed.

A flexible and collaborative approach was needed to meet the extremely challenging project timetable while maintaining  safety and quality standards throughout

Steam & Condensate system
Process pipework
Chilled Water Pipework Layout
Compressed Air Ring Main Layout
Gas services

More Info

Client: Briggs

Project: Everard's brewery

Project Summary:

Sector // Food

Everard's brewery // Briggs

Installation of Mechanical Equipment

Skid packages, Valve Blocks

Complete Brewery Piping System

More Info

Client: Princes

Project: Bradford

Project Summary:

Sector // Food

Bradford // Princes

Pump Skids & Pipework System

Steelwork support structure

More Info

Client: Veolia Water

Project: Skids

Project Summary:

Sector // Utilities

Skids // Veolia Water

Defabs has been providing skids for the Veolia Water for the past five years and has already completed 5 so far in 2022.

These vary from skid to skid in size and requirements, and are in use to treat water, either on a fixed site or used as mobile devices. So considering the requirements these must be manufactured to a high standard, are fully quality checked before being released from our workshop. We have a dedicated team on the works to ensure consistency of quality and awareness of the client’s requirements.

Whilst the instructions are received with a detailed specification, P&ID, and a manufacturing document schedule, it is up to Defabs to correctly interpret these requirements, ensure on time completion, as there is often a short delivery period, plus issue with full documentation and traceability to include weld maps, weld logs, welder qualifications, material certificates, final drawings, test certification and calibration information.

Quality inspections include testing and dimension checks, plus visual inspections and weld checks.

Defabs fabricates within the workshop the tank, pipework and frame, within a dedicated area of the workshop, in line with our ISO 9001:2015 procedures to ensure consistency of the completed product.

More Info

Client: Various

Project: Recent Works

Project Summary: Various Work/Projects for Clients

Sector // Various

Recent Works // Various

Some recent works carried out for various clients.

Defabs works with Clients from a wide variety of Sectors

More Info

Client: Various

Project: Various Work

Project Summary:

Sector // Various

Various Work // Various

More works for various clients

Defabs works with Clients from a wide variety of Sectors

More Info

Client: Greencore

Project: selby

Project Summary:

Sector // Food

selby // Greencore

Pump Skids & Pipework System

Steelwork support structure

More Info

Client: Briggs

Project: Novartis

Project Summary:

Sector // Pharmaceutical

Novartis // Briggs

Skid built MDI Mixing System

ASME BPE Pharmaceutical Pipework System

CE Marked Support & access platform

More Info

Client: Hain Daniels Group

Project: Grimsby

Project Summary:

Sector // Food

Grimsby // Hain Daniels Group

Process Kettle refurbishment

Stainless steel platform fabrication

Piping system to vessels

More Info

Client: 2 Sisters Food Group

Project: ROGERSTONES

Project Summary:

Sector // Food

ROGERSTONES // 2 Sisters Food Group

A contract with a Leading Producer of British Cooked Poultry.

The project involves the installation of Mechanical Services to the new Production areas and Energy Centre.

Thermal Oil

Steam

More Info

Client: SPIE

Project: MOY Park Hatchery

Project Summary:

Sector // Food

MOY Park Hatchery // SPIE

SPIE contracted Defabs to install the mechanical services package for a new poultry butchery and
production unit.

Domestic Hot & Cold Water Layout to Sinks and Showers

LTHW Service

Chilled Water Pipework Layout

Process Hot and Cold Water Layout

Compressed Air Ring Main Layout

Foam Sanitiser and Hygiene Hot Water Layout

More Info

Client: Britvic

Project: Rugby

Project Summary:

Sector // Food

Rugby // Britvic

Pump Skids & Pipework system
 

Steelwork support structure

More Info

Client: Coca-Cola

Project: Wakefield

Project Summary:

Sector // Food

Wakefield // Coca-Cola

Pump Skids & Pipework system

Steelwork support structure

More Info

Client: Refresco

Project: Wrexham

Project Summary:

Sector // Food

Wrexham // Refresco

Manufacture 10 off x10T Mixing Vessels

Ingress of Vessels
Transfer Pumps & Flow Plate
Pipework distribution system

More Info

Client: SPIE

Project: Crown Ooultry new build factory

Project Summary:

Sector // Food

Crown Ooultry new build factory // SPIE

Installation of the mechanical services package for a new poultry butchery and production unit.

Domestic Hot & Cold Water
LTHW Service
Chilled Water Pipework Layout
Process Hot and Cold Water Layout
Compressed Air Ring Main Layout
Foam Sanitiser and Hygiene Hot Water Layout

More Info

Client: SPIE

Project: Jacksons Bakery new build factory

Project Summary:

Sector // Food

Jacksons Bakery new build factory // SPIE

Installation of the mechanical services for a new purpose built manufacturing facility.

Defabs team liaised closely with the client's project manager to agree a phased installation of services to production equipment as the project progressed.

A flexible and collaborative approach was needed to meet the extremely challenging project timetable while maintaining  safety and quality standards throughout

Steam & Condensate system
Process pipework
Chilled Water Pipework Layout
Compressed Air Ring Main Layout
Gas services

More Info

Client: Scott Bader

Project: Pressure Vessel

Project Summary: Defabs have recently carried out the Design, Manufacture and installation of a 33,000 litre Limpet Coil Pressure Blending Vessel. The vessel was fabricated at our Derby facility and transported to the clients site where Defabs completed the vessel ingress and associated pipe-work installation.

Sector // Chemical

Pressure Vessel // Scott Bader

Defabs have recently carried out the Design, Manufacture and installation of a 33,000 litre Limpet Coil Pressure Blending Vessel. The vessel was fabricated at our Derby facility and transported to the clients site where Defabs completed the vessel ingress and associated pipe-work installation.
 
Vessel Construction
3.2 metres Diameter  
4.0 metres Tan to Tan  
Vertical cylindrical configuration
2:1 dished top and bottom.
Limpet Coil Jacket over dished bottom and vessel straight side.

Vessel Finish  
Internally polished to a 0.5µM Ra finish
All welds ground smooth and polished to 0.5µM Ra finish

Design Criteria
PD5500 Cat 2, 2000 & PED 97/23/EC Gas Group 1
Design Pressure: 3.0 Bar G + Full Vacuum 32 Bar G
Design Temperature: 165 C  
Radiography: 10% Butt Welds